This week, the group moved onto a more constructive phase. We each had the opportunity to cut our panels with the laser cutter, and we began construction on the extra wall that will hang in the gallery. We attatched two door panels together with brackets, and spackled them together. From there, we began priming and painting the wall, as well as assembling the cube and testing the lighting.
We are on a steady roll for the final week!